Back on thread.
This week one of our stations ran into the quality control issue.
The station handled PI and mainline.
Mesa commenced operations recently, as well.
A Mesa a/c with the APU inop is scheduled into the station - normally, a routine kind of thing. But nooooooooooo, now the circus comes to town.
1. No one in the station had been trained on the CRJ at all.
2. Equipment compatibility issues. Can a mainline airstart unit mate up to CRJ's? Ground power? Where the @#$%&* are the access panels for all of the above?
3. They could have figured all of that out, but then came the show stopper. The one GPU in the station electrically compatible with the CRJ belonged to PI, whose dispatch said, you better not hook that up to a Mesa jet.
Results, the flight delayed in CLT to fuel it for the roundtrip, and a single engine turn!
The shape of things to come.
This week one of our stations ran into the quality control issue.
The station handled PI and mainline.
Mesa commenced operations recently, as well.
A Mesa a/c with the APU inop is scheduled into the station - normally, a routine kind of thing. But nooooooooooo, now the circus comes to town.
1. No one in the station had been trained on the CRJ at all.
2. Equipment compatibility issues. Can a mainline airstart unit mate up to CRJ's? Ground power? Where the @#$%&* are the access panels for all of the above?
3. They could have figured all of that out, but then came the show stopper. The one GPU in the station electrically compatible with the CRJ belonged to PI, whose dispatch said, you better not hook that up to a Mesa jet.
Results, the flight delayed in CLT to fuel it for the roundtrip, and a single engine turn!
The shape of things to come.