eolesen
Veteran
- Joined
- Jul 23, 2003
- Messages
- 15,959
- Reaction score
- 9,374
All true on the forklift procedure being more or less an approved procedure. It's also likely that the three engineering mistakes (pylon + hydraulic lines + lack of slat interlocks) that manifested themselves with AA 191 would have done so with another operator.