Whatnow?
Veteran
- Nov 4, 2003
- 862
- 8
Is there a difference in what we're talking about here? Using a hardstand and deplaning passengers down onto the ramp and then on to busses to go to the terminal is one thing, but using PTV's that connect to the A/C and passengers load directly onto the bus is another thing. The PTV's will not be able to unload ALL the passengers from the A/C all at once, so it will take more than one PTV right? That being said with an A/C out on a tarmac with no jetway or hardstand attached to it, all the Doors will have to be re-armed in case of emergency onboard the A/C every time a PTV left, then disarmed again once another PTV arrived, and so on for as many PTV's as it will take to get all of the passengers off the A/C. I would think there is an issue with arming/disarming doors that would come into play here also. JMO, but wouldn't the risk of inadvertant slide deployments also rise using the PTV procedure? Using hardstands and busses like they do in Europe would seem more logical.