a week or so ago,someone came up with the brite idea in hangar 5 base inspection that it would be a good idea to eliminate the inspectors in the sheetmetal shop and add them to hanngar inspection.so they abolished the sh metal inspectors(4 or so)and were going to increase the head count in hangar insp,then farm guys in sheet metal as needed.someone discovered you can''t farm into an area that doesn''t have inspectors.so they recinded all the abolishments.
end of story?ah ha ha..stay tuned,it gets even better.
in PIT ssb building there are about 8 or 9 inspectors over 3 shifts in about 3 or 4 different bid areas.well now it looks like its a good idea to abolish these 3 or 4 bid areas and create one new bid area and send inspectors to each of the old areas as needed.also this abolishment was originally intended to have the end result of eliminating one inspector.the new bid area was supposed to encompass ndt-hydro shop,elec shop,composite shop and weld/plasma repair.it will be called:-ndt/rep/fluid/comp .well when they posted the bid they forgot to put ndtat the begining.
so they awarded 2 lead insp and 5 inspectors positions on a bid area that doesn''t exist.also they abolished 2 leads and 6 insp''s from the original area and they are exorcising their seniority to bump another 6 inspectors and leads in other areas.these guys who were awarded the bids to the wrongly worded area are also supposed to get abolished.
so now about 23 inspectors are getting bumped around to eliminate 1 guy.
end of story?ah ha ha..stay tuned,it gets even better.
in PIT ssb building there are about 8 or 9 inspectors over 3 shifts in about 3 or 4 different bid areas.well now it looks like its a good idea to abolish these 3 or 4 bid areas and create one new bid area and send inspectors to each of the old areas as needed.also this abolishment was originally intended to have the end result of eliminating one inspector.the new bid area was supposed to encompass ndt-hydro shop,elec shop,composite shop and weld/plasma repair.it will be called:-ndt/rep/fluid/comp .well when they posted the bid they forgot to put ndtat the begining.
so they awarded 2 lead insp and 5 inspectors positions on a bid area that doesn''t exist.also they abolished 2 leads and 6 insp''s from the original area and they are exorcising their seniority to bump another 6 inspectors and leads in other areas.these guys who were awarded the bids to the wrongly worded area are also supposed to get abolished.
so now about 23 inspectors are getting bumped around to eliminate 1 guy.
![14.gif'']](/proxy.php?image=http%3A%2F%2F%5Bimg+src%3D%27%27http%3A%2F%2Fwww.usaviation.com%2Fidealbb%2Fimages%2Fsmilies%2F14.gif%27%27%5D+%5Bimg+src%3D%27%27http%3A%2F%2Fwww.usaviation.com%2Fidealbb%2Fimages%2Fsmilies%2F14.gif%27%27%5D&hash=c9963b16e425fe3b2b365b3bcbdbfd29)