Pit Jan. Airbus Down To 26 Blocks

In keeping with the thread title (sort of), I see on the ALPA board that DCA 737 blocks are down 22%. So far, looks like CLT 737 is holding it's own with no reduction from Dec (and no increase in blocks, but pretty good increase in block hours)

Jim
 
BoeingBoy said:
I dunno, a gold star or something....

Jim

ps - an extra bag of pretzels will do.
[post="201080"][/post]​


pretzels..... I remember getting caviar and moravian cookies on LAX-CLT when I got bumped to first non-rev in the summer of '84! (maybe it was 85.... wow still quite a while ago.)
 
BoeingBoy said:
I dunno, a gold star or something....

Jim

ps - an extra bag of pretzels will do.
[post="201080"][/post]​
How about an ice scooper? None of us ever us those anyway. You can find about ten per aircraft. Might come in handy thru the holidays.
 
  • Thread Starter
  • Thread starter
  • #79
N924PS said:
Boy did this topic go astray. There are 56 PIT Airbus Blocks for JAN 2005.
Who knows for FEB though.
[post="201043"][/post]​

Ooops. You're right there are 56 Airbus blocks in PIT. WinBid had a technical problem where it only showed 26 lines; hence a major hissy from those of us that use it to bid. Mea culpa. Now, about February....anyone care to place some Vegas odds here?
 
Pittsburgh will have one fleet type in February, probably the A320. Expect B767/B757 and B737 flying to be transferred to PHL/CLT, with some increase in B737 time in DCA.

It's unclear how the reduction in PIT flying will effect the A320.

Regards,

USA320Pilot
 
USA320 Pilot,

How many flights do you expect in Pitt come Febraury? How many 320's?

Thanks
 

Latest posts

Back
Top