USA320Pilot
Veteran
- Joined
- May 18, 2003
- Messages
- 8,175
- Reaction score
- 1,539
MEC CODE-A-PHONE UPDATE - November 19, 2004
This is Jack Stephan with a US Airways MEC update for Friday, November 19th, with one new item.
The Company has posted Permanent Bid 05-01. The effective month of the bid is February 2005.
The drivers of the bid include:
Ø Vacancies and displacements resulting from attrition, contingency openings and retirements.
Ø Increase CLT Banks from 8 – 10
Ø Rolling the PHL Hub
Ø Inauguration of the FLL connecting Bank
Ø Primary Lines planned for higher credit time per LOA 93
Ø Adjustment to DCA - BOS Shuttle times.
Ø CLT AB IRO qualifications.
Ø CUN and MBJ removed from the 767I and added to 757D flying.
Ø PIT status changed from a HUB to a Focus city.
There will be no furloughs as a result of bid 05-01. February block hours will increase by 2,900 hours to approximately 86,000 hours. There will however be a reduction (through attrition) of 120 positions.
A copy of the bid is available on the MEC pilots only website by clicking on “Bid 05-01†under the MEC Fast Links.
The bid will close at 2330 EST on November 28th.
Please remember we have 1,879 pilots on furlough.
Thank you for listening.
Regards,
USA320Pilot
This is Jack Stephan with a US Airways MEC update for Friday, November 19th, with one new item.
The Company has posted Permanent Bid 05-01. The effective month of the bid is February 2005.
The drivers of the bid include:
Ø Vacancies and displacements resulting from attrition, contingency openings and retirements.
Ø Increase CLT Banks from 8 – 10
Ø Rolling the PHL Hub
Ø Inauguration of the FLL connecting Bank
Ø Primary Lines planned for higher credit time per LOA 93
Ø Adjustment to DCA - BOS Shuttle times.
Ø CLT AB IRO qualifications.
Ø CUN and MBJ removed from the 767I and added to 757D flying.
Ø PIT status changed from a HUB to a Focus city.
There will be no furloughs as a result of bid 05-01. February block hours will increase by 2,900 hours to approximately 86,000 hours. There will however be a reduction (through attrition) of 120 positions.
A copy of the bid is available on the MEC pilots only website by clicking on “Bid 05-01†under the MEC Fast Links.
The bid will close at 2330 EST on November 28th.
Please remember we have 1,879 pilots on furlough.
Thank you for listening.
Regards,
USA320Pilot