According to the web site, the final 2 A330-200's will have the suites installed "By November 2010".
http://www.usairways.com/en-US/traveltools/intheair/envoyfirst/progressreport.html
Have either (or both) of the last 2 in the fleet been sent or scheduled for the refurb?
I ask this because the web site was far behind in updating progress and fleet count, so I'm not putting a lot of stock in what it tells us....
http://www.usairways.com/en-US/traveltools/intheair/envoyfirst/progressreport.html
Have either (or both) of the last 2 in the fleet been sent or scheduled for the refurb?
I ask this because the web site was far behind in updating progress and fleet count, so I'm not putting a lot of stock in what it tells us....