Docker
Member
- Joined
- Sep 28, 2005
- Messages
- 89
- Reaction score
- 20
So anybody know why the relocation of the PIT engine shop qec to CLT has been put on hold? We have already received a few truck loads of equipment and 3 engines in CLT. The CLT location is already staffed with 8 mechs and a lead. Heard TIMCO is backing out of their deal with the city of PIT.