Boeing workers found cracking part on some 737NG jets

Buck

Veteran
Contributor
Aug 20, 2002
7,319
1,555
https://www.foxbusiness.com/technology/boeing-cracked-part-737ng-jets

Item 310

71012112_2852002248143403_691353743106506752_n.jpg
 
Last edited:
I was curious about these articles popping up.
No discussion on Boeing Fleet Team or IdeaXchange about this.
 
So inspections are coming. AD related. As usual, see it on the news before hearing from the company.
 
AD is out. Boeing 737 NGs with more than 30,000 cycles must be inspected within seven days, while planes between 22,600 and 29,999 cycles must be inspected over the next 1,000 cycles of the aircraft.
 
  • Thread Starter
  • Thread starter
  • #6
AD is out. Boeing 737 NGs with more than 30,000 cycles must be inspected within seven days, while planes between 22,600 and 29,999 cycles must be inspected over the next 1,000 cycles of the aircraft.
Thanks
 

Latest posts

Back
Top